Header Ads Widget

Ticker

6/recent/ticker-posts

Second City Construction

So it seems that General Services sent out an e-mail stating that the amazing collapsing station in 001 will have the center structural wall with the 4 inch cracks rebuilt so as to avoid further political embarrassment. The letter went out the day after this video was posted on our site.

We also received some updated photos from this post on 07 May

Reports are that General Services sent plumbers and electricians into 011 to take down the "drip trays" and actually repair the wiring that was somehow mixed with the water, leading to what the IBEW calls a "bad idea."

A month or so ago, we told the tale of the main door to E&RPS being non-functional for three years and that week, there were all sorts of contractors over there fixing it.

We can only conclude that the Policy Group, Mike Masters, and J-Fled himself are reading the blog, looking for construction projects to finish.

We're going to open the comment section for readers to list any and all repair jobs that have been neglected for years, even decades, and we'll see how many things we can get fixed. But don't go posting "my basement," or "my 180,000 mile pool car." We only want to list things that have a realistic chance of being repaired, like that dip on the 5th floor that Masters like to roll marbles on.

Post a Comment

0 Comments